Glow Worm Flexicom 24hx User Manual

  1. Glow Worm Flexicom 24cx Installation Manual
  2. Glow Worm Flexicom 24hx Installation Manual
  3. Glow Worm Flexicom 24cx Manual
Thank you for installing a new Glow-worm appliance in your home.

Sep 28, 2015 Hi I'm Dave at G20 Gas Services in Manchester. If you find that your Flexicom boiler has stopped working it may just be that the system pressure has dropped below 0.5 Bar. To increase the pressure. Glow-worm produces a wide range of heating and hot water products, including first-class, high-efficiency combi boilers.Note: All extended guarantees stated are only available when registered by a Club Energy installer.

Glow-worm appliances are manufactured to the very highest standard so we are pleased to offer
This product is guaranteed for 24 months from the date of installation or 30 months from the date
of manufacture, whichever is the shorter, for parts and labour.
The second year of the parts guarantee, from the beginning of the 13th month onwards after

Glow Worm Flexicom 24cx Installation Manual

installation or manufacture, is conditional upon the boiler having been serviced by a competent

Glow Worm Flexicom 24hx Installation Manual

person approved at the time by the Health and Safety Executive in accordance with the
manufacturer’s recommendations. We strongly recommend regular servicing of your gas
appliance, but where the condition is not met, any chargeable spare parts or components issued
within the applicable guarantee period still benet from a 12 month warranty from the date of issue
We recommend you complete and return as soon as possible your guarantee registration card.
If your guarantee registration card is missing you can obtain a copy or record your registration by
telephoning the Glow-worm Customer Service number 01773 828100.
Customer Service:

Glow Worm Flexicom 24cx Manual

Technical Helpline:
General and Sales enquiries:
Fax: 01773 820569
Instructions
0800 0732142
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided
with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s
instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. The Benchmark
Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of
Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.